Mould making, explained by the people who cut the steel.
No marketing fluff — practical guides on lead time, steel selection, price comparison and quality inspection, written by our tooling engineers.
7 part design mistakes that quietly add 30% to your tooling cost.
Undercuts, wall-thickness jumps, missing draft and over-tight tolerances all add silent cost — paid in sliders, polishing hours and trial loops. The seven mistakes we see most, and the free fix for each before the steel is cut.
Why do mould quotes differ by 40%? The five things every buyer should compare.
Two suppliers quote the same part and the prices are worlds apart. Sometimes it's markup — but usually it's steel grade, cooling design, cavity count, guaranteed cycle life or what's quietly left out. Here's how to compare like-for-like before you place the PO.
Injection mould lead time: what actually happens in those 4–12 weeks.
A week-by-week breakdown of a real mould project — DFM, tool design, steel cutting, CNC, fitting, T1 trial and shipping. Know which stages you can compress, and which ones punish you later if you rush.